Our company conduct power equipment testing in Shandong.Our company successfully completed all the power equipment handover test tasks for the 30MW photovoltaic power station in Zhangying, Yuncheng, Shandong.
Photovoltaic power station refers to a photovoltaic power generation system that uses solar energy and uses special materials such as crystalline silicon plates, inverters and other electronic components to form a power generation system that is connected to the grid and transmits power to the grid. Photovoltaic power plants are currently a green power development energy project that is strongly encouraged by the state. Shandong Huanyu Group (referred to as Huanyu Group) is an engineering company focusing on general engineering contracting. The company has general contracting of municipal public engineering construction, general contracting of electric engineering construction, professional contracting of environmental protection engineering construction, and electrical installation (repair, test) licenses, and has passed the certification of quality management system, environmental management system, and occupational health and safety management system ; Able to undertake general contracting work for solar power generation projects, municipal public works, electric power projects, and environmental protection projects.

Test summary:

On April 15, 2016, our company undertook the power equipment handover test of the Shandong Yuncheng Zhangying 30MW photovoltaic power station at the construction site of Shandong Huanyu Group, and distributed all the test equipment required for the four-level maintenance test. And conduct handover tests on all power equipment.
The task is heavy, the time is tight, the workload is large and the conditions are very difficult. Due to fieldwork, we overcome the problems encountered in our work and take every test report seriously. Look for errors in the experiment. The following high-voltage equipment tests were done: main transformer, grounding transformer, excitation transformer, high-voltage circuit breaker, secondary microcomputer protection, cable, box transformer, zinc oxide arrester, CT, PT, grounding and other equipment, and a test report was issued. Our products have been unanimously recognized by the staff