Configuration Scheme of High-Voltage Experimental Equipment for Power Supply System.This table describes the configuration and parameters of the Dc hipot test equipment, etc.The new “Administrative Measures for Installation (Repair, Test) Power Facilities Licenses” will come into effect on October 11, 2020. The “Administrative Measures for the Installation (Repair, Test) Electric Power Facilities License” (State Electricity Regulatory Commission Order No. 28) promulgated by the former State Electricity Regulatory Commission on December 18, 2009 shall be repealed simultaneously. Litai Power briefly introduces the new version of the guide for the selection of construction machinery and equipment required for the five-level power facility license for undertaking (repair, test) testing.

Level 5 Test equipment and test laboratory standard test equipment for undertaking (repair, test) power facility license
Serial numberEquipment nameUnitQuantitySpecificationProduct name
OneHigh-voltage generating equipment
1DC high voltage generatorset 1DC:60kV/2mAZGF-60kV/2mA
2Power frequency AC withstand voltage test complete setset 1AC:5kVA/50kV LTYD-30kVA/50kV
3Frequency conversion series resonance test complete setset 175KVA/75KV/1ALTZB-75KVA/75KV
30~300Hz
SecondElectrical measuring instruments
1Loop resistance testerstation1DC:≥100ALTHL
2Transformer volt-ampere characteristic testerstation1500V/5ALTFA-B
3Transformer DC Resistance Testerstation1DC:≤1ALTZR-5
4Transformer ratio testerstation1LTBC-II
5Circuit breaker characteristic testerstation1DigitalLT-3000
6Ground Resistance Testerstation1LT2571
7Three-phase relay protection testerstation1Three-phase current, three-phase voltageLTJB-802
Third Commonly used instruments
1Megohmmeterset 4DC: 500V and aboveLT2551
4Clamp ammeterset 1