Project Description
Measures for the Administration of Installation (Repair, Test) Power Facilities License
Some about power transformer testing equipment.
Chapter One General
Article 1. In order to strengthen the management of the license for installation (repair, test) power facilities, maintain the market order of the The Regulations on Supply and Use and relevant national regulations formulate these measures.
Article 2 These Measures shall apply to the application, acceptance, review, issuance, management and supervision of licenses for installation (repair, test) power facilities. Otherwise prescribed by the State shall prevail.
Article 3 The State Electricity Regulatory Commission is responsible for guiding and supervising the issuance and management of licenses for the installation (repair and test) of electric power facilities nationwide.
The agency dispatched by the State Electricity Regulatory Commission (hereinafter referred to as the licensing agency) is responsible for the acceptance, review, issuance, and daily supervision and management of the license for installation (repair, test) power facilities within its jurisdiction.
Chapter 2 Classification and Classification
Article 4 Licenses for undertaking (repairing and testing) electric power facilities are divided into three categories: undertaking, undertaking and undertaking test.
Those who have obtained a license for contracting (repairing, testing) power facilities may engage in the installation business of power facilities.
Those who have obtained the permit for undertaking installation (repair, test) power facilities may engage in the maintenance business of power facilities.
Those who have obtained the license for the testing-oriented installation (repair, test) power facilities can engage in the testing business of power facilities.